Every successfully delivered interior project goes through several consecutive stages.

Design lays the foundation of your project. Then comes preparation and the build - the stage where careful checks, good organization and professional management make sure the design is carried out exactly as intended.

  1. Interior designSpace planning, 3D visualizations and working drawings
  2. BudgetQuotes for materials, products and works
  3. Set-out of electrical and plumbing pointsPositions checked and marked on site
  4. Project managementControl and management of the work
  5. Delivery managementOrders, deadlines and deliveries until installation
  6. BuildTo the approved concept, budget and schedule

Each step builds on the one before. When design preparation and execution are organized as one continuous process, the result is a build that follows the design with the precision it needs.

Project management

Control, coordination and management of the work during the build

Every renovation is a sequence of connected tasks. Even a small deviation at one stage can lead to rework, delays and extra costs at the next ones. Project management provides the organization and control needed for every construction task to be carried out according to the design, in the right order and to the right quality.

Our role: the real value of the service is not in the site visits and inspections, but in actively tracking and managing every key stage. This way we find and prevent potential deviations before they become a real problem during the build.

We recommend combining it with On-site set-out of electrical and plumbing points. The design is checked and refined before the start, and its exact execution is ensured during the build.

Comparing the work on site with the 3D visualization on a tablet

We created two packages with a different level of involvement - choose the level of control and support that best suits your project.

Option I

Key Stage Control

You remain the active party in communicating with the contractor, while Fine Design continues to represent your interests.

We step in at the agreed key stages of the renovation, carry out professional checks and set out what needs to be done to continue the work. The coordination between inspections and the day-to-day organization of the renovation remain your responsibility.

€3,770excl. VAT
What the package includes

The project manager, who knows the details of your design, tracks its execution through inspections at the critical stages and helps you with technical questions. When something needs to change, they analyze the situation, propose the right solution and coordinate how it is applied, so deviations are found in time and decisions are made with full information.

  • A kick-off meeting with all subcontractors to go through the design, the working drawings, the concept design and the order of works.
  • Control of the agreed key stages of the renovation against the approved design.
  • An inspection and an opinion on the completed works before moving on to the next stage.
  • An inspection report with the discrepancies found, recommendations and the corrections needed.
  • Coordination between the client, the contractor and the project manager when technical questions come up.
  • Expert guidance on planning and sequencing all key processes.
  • A follow-up inspection, if needed, once the corrections have been made.

Which package is right for your project?

Key Stage ControlFull Project Management
Kick-off meeting with subcontractorsYesYes
Control of the key stagesYesYes
Quality checks and inspection reportsYesYes
Expert guidance and recommendationsYesYes
Involvement in resolving issuesAdvisoryYes
Managing the order of processesPartialYes
One main coordinatorNoYes
Coordination and direct communication with contractorsNoYes
Ongoing tracking of the workNoYes
Active management of the buildNoYes
Price excl. VAT€3,770€7,850

Both packages guarantee professional control. The difference is who manages the process between the inspections.

Key stages we control

They are the same in both packages - what differs is how the control is carried out. Open a stage to see what we check.

1Kick-off meeting with subcontractors

Before construction works begin, Fine Design and the contractor go through the design documents and discuss all technical requirements, the specifics of the project and the order of works. This reduces the risk of misreading the documents, incorrect execution, later corrections and delays.

What is discussed?

  • The working drawings, technical documents, wall elevations and all construction details.
  • The concept design.
  • The order of works and how the processes depend on each other.
  • Potential technical challenges and how to prevent them.
  • All specific requirements to be followed during the build.

Result: the contractor signs a record confirming they are familiar with all design materials, technical requirements and the specifics of the property.

2Electrical installations

One of the two most important stages at the start of construction - much of the later work depends on the correct position of the switches, sockets, light fittings and electrical points.

  • All planned switches, sockets and electrical points are in place;
  • Heights, distances and positions are accurate;
  • They align with the furniture, appliances and light fittings;
  • Cable routes and technical solutions are executed correctly;
  • No points are missing, misplaced or incorrectly installed.
Electrical installation in a hallway during renovation
Key Stage Control

A check after the electrical works and before the next stage, with an opinion and the corrections needed.

Full Project Management

Regular control while the work is being done, timely instructions and follow-up of corrections before the stage is closed.

3Plumbing installations

The second of the two most critical stages - mistakes here can often only be fixed by breaking out, rework and delays.

  • The position of every plumbing point;
  • The layout and heights of the water supply and drainage routes;
  • Alignment with the sanitary ware and furniture;
  • The position, number and levels of linear and/or floor drains - they set the falls of the floor finishes.
Key Stage Control

A check after the stage and before the next one, with an inspection report if needed.

Full Project Management

Control from the start of the work and throughout - deviations are corrected while the work is under way.

4Tiling

One of the stages that most affects the final look of the interior.

  • Visual match with the design, starting point and direction of laying, patterns and compositions;
  • The layout and line of the joints;
  • Outside corners - mitred edges or trims as designed, niches and decorative elements;
  • Accurate positions of all switches, sockets, lighting points and plumbing points.
Key Stage Control

Two checks - before tiling starts and after the stage is finished.

Full Project Management

Tracking throughout - every detail is checked as it is being built.

5Plastering and skimming

The base for all finishing work - every flaw becomes far more visible after paint or plaster.

  • All walls and ceilings are flat and smooth;
  • The finish on plasterboard walls, ceilings and niches;
  • Execution around openings, corners, windows and doors;
  • No cracks, dents or scratches, and the surfaces are ready for paint, plaster or wallpaper.
Key Stage Control

A check after the skimming and before painting or other wall finishes.

Full Project Management

Control from the start of the work, with advice and instructions for corrections as it goes.

6Paint and other wall finishes

Fine Design decides the right moment and coordinates the order of work, so finishes go onto fully prepared surfaces.

  • Surfaces are prepared before the finish is applied;
  • Materials and colors match the approved design;
  • Plaster, wallpaper and wall murals are applied to the manufacturers' requirements, with no visible defects.
Key Stage Control

A detailed inspection once the work is finished.

Full Project Management

Tracking during the work, coordination and timely instructions.

7Preparing custom furniture for production

The final site measurement, checked against the design documents, makes sure the furniture is made to the finished space. We also organize a meeting with the furniture maker.

  • Dimensions are taken after all necessary construction works;
  • All changes made during the build are taken into account;
  • The maker measures or inspects the site in person and every detail is confirmed with them.
Key Stage Control

We attend the final measurement and confirm that production can begin.

Full Project Management

We coordinate the whole process - meetings, measurement, production schedule and delivery dates.

8Installing the kitchen and furniture for stone worktops

These units go in before the rest of the furniture, because the worktops and stone elements are made to fit the installed units.

  • The installation follows the design and allows an accurate measurement for the stone;
  • Cut-outs, clearances and ventilation grilles are done correctly;
  • Edging, fillers and plinths are made as designed.
Key Stage Control

An inspection after installation and confirmation that the stone can be measured.

Full Project Management

Tracking during installation and coordination between the furniture maker and the stone contractor.

9Installing furniture and wall panelling

A final check before handover - that every piece is made and installed to the approved drawings, with no production, installation or transport issues.

  • Dimensions and layout match the design;
  • Edges, joints and seams are well finished and the hardware works properly;
  • All notes from earlier inspections have been addressed.
Key Stage Control

A detailed final inspection and a report with corrections before handover.

Full Project Management

Coordination and control during installation and a final inspection after all corrections.

Additional services for the build

Interior designer checking the positions of the points on site

On-site set-out of electrical and plumbing points

Every approved design decision is checked on site. Marking the positions, distances and heights of the electrical and plumbing points means discrepancies are found and corrected in time - before the renovation, when changes are easiest.

€500excl. VAT

How it works

Real conditions on site can reveal technical inaccuracies, omissions or corrections that cannot be spotted on a drawing. The designer who made the drawings marks the exact positions, heights and distances on site.

  • Review of all working drawings on site;
  • Set-out of switches, sockets, light fittings and plumbing points on the walls;
  • Marking of the main furniture and checking the points against its actual position;
  • Analysis of any discrepancies and the corrections needed;
  • Discussion with the client and final approval before the renovation starts.

The benefits

  • A real sense of where the key elements will be before the renovation starts.
  • Conflicts between furniture, electrical and plumbing points and the structure are found.
  • Clear instructions for the contractors on exact positions, heights and execution.
  • Better planning and use of materials.
  • Less risk of mistakes, rework and extra costs.

Result: construction works start with clearly defined positions, minimal risk of mistakes and no need for later corrections.

Materials delivered to the site, ready for installation

Delivery management

We select the most suitable materials, products and equipment for the design and take over ordering, communication with suppliers and tracking of deliveries until everything is ready for installation. You save time, and our established partners offer you preferential terms.

€4,000excl. VAT

How it works

  1. Interior design
  2. Choosing materials and products (with the client)
  3. Choosing suppliers and coordination
  4. Placing the orders
  5. Tracking production
  6. Control of production and delivery deadlines
  7. Arranging transport
  8. Receiving the deliveries
  9. Handing over the site, ready for installation

What you get

  • Consultations and meetings in showrooms, on site, by phone or by e-mail.
  • Access to preferential prices through our established partners.
  • Selection of suppliers and quotes for all materials, products and equipment in the design.
  • Placing orders and communicating with manufacturers and suppliers.
  • Control of production deadlines and the order of deliveries.

We coordinate delivery and installation of

Tiles and sanitary wareShower enclosures and glassStone window sills and thresholdsWood flooringLight fittingsSwitches and socketsDoorsCurtainsFurnitureAir conditionersGas boilerRadiatorsCleaning

If you would like to use any of the services listed,
please get in touch with us at any time.